đAKAR Solar Power Plant Project | Bilecik
- Goldstein Renewable
- Aug 19
- 1 min read

The Akar Solar Power Plant (9.98 MWp / 7.8 MWe), developed on behalf of AK-AR Kalıp Metal ve Plastik ĂrĂŒnleri San. ve Tic. A.Ć. in Bilecik, has successfully passed the TEDAĆ acceptance. We provided photovoltaic module manufacturing inspection and on-site supervision services.
With our consultancy expertise, we completed the permit processes thoroughly and efficiently, and through our inspections contributed to the commissioning of a high-standard power plant that will operate safely for many years.
Your reliable partner for sustainable energy projects.
Comments